Connemara extend drilling programme following positive results
Connemara Mining extended a drilling programme at Lough Sheelin following initial positive results.
Positive indicators extended the drilling programme at the Cavan site ensuring that 11 drill holes were completed instead of the originally planned five. Results have been received on two on the drill holes with samples from a further five currently undergoing laboratory testing.