Repair work to track flaws 'not urgent'

Operators of Dublin’s Luas system today insisted that flaws found on suburban sections of track are not an immediate risk to public safety and repair work is not urgent.

Repair work to track flaws 'not urgent'

Operators of Dublin’s Luas system today insisted that flaws found on suburban sections of track are not an immediate risk to public safety and repair work is not urgent.

An engineering study commissioned by the system’s builders, AMB Joint Ventures, found that nearly eight kilometres of both the Red and Green Lines had deficiencies in the underlying bonding material.

The polymer/cork substance is designed to reduce noise and vibration at certain sections of track.

The Rail Procurement Agency said today that the repair work will be carried out shortly and should not affect services.

RPA spokesman Ger Hannon said the flaws were only present on accessible suburban sections of track and not at city-centre locations.

The affected sections are mounted on concrete slabs and attached by metal clips, such as along the Grand Canal on Davitt Road.

When the work is completed, AMB will be able to guarantee the lines for up to 50 years with minimal maintenance.

“We can carry out the work over the next few months and it should take place over several weeks, depending on the level of resources we apply to it,” Mr Hannon said.

“We need to know that this work will last 50 years.

“The work should not involve disruption and passengers shouldn’t know that it’s going on.

“It will be carried out at no extra cost to the Exchequer.”

The engineering study was carried out by the Institute for Railway Engineering at the University of Graz in Austria.

x

More in this section

Lunchtime News

Newsletter

Keep up with stories of the day with our lunchtime news wrap and important breaking news alerts.

Cookie Policy Privacy Policy Brand Safety FAQ Help Contact Us Terms and Conditions

© Examiner Echo Group Limited