Check out the latest construction progress at Pairc Uí Chaoimh

The new Pairc Uí Chaoimh is well underway. Check out our footage of the latest works being done.

Sixty-tonne roof trusses were lifted into place by Crane Hire Ltd., for the roof of the main covered stand at Pairc Uí Chaoimh.

Video by Larry Cummins.


Lifestyle

Breanndán Ó Beaglaoich will not let a day pass without his ritual dip in the sea, which he describes as the best anti-depressant ever, says Lorna Siggins.Taking the plunge has a depth of benefits

10% of women suffer from it worldwide.As Alexa Chung reveals she has endometriosis, here’s everything you need to know about the condition

Pinnies, cookie cutters and wooden spoons at the ready.Food projects to do with the kids this summer

Stop. Climbing. Uluru.As tourists rush to climb Uluru despite an incoming ban – 5 ways to enjoy the rock respectfully

More From The Irish Examiner