Grenfell Tower panel-makers 'cannot control how they are installed'

The US manufacturer of the cladding panels on Grenfell Tower in London, where at least 80 people died in a fire last month, has said it stopped selling them for high-rise buildings because it cannot control how they are installed.

David Hess, interim CEO of Arconic, said the company is still working with investigators on the blaze.

Mr Hess said it is up to other companies, including architects and contractors, to ensure that cladding systems comply with codes and regulations.

An AP review found some building owners in the US were unaware that the same Reynobond panels, which have a polyethylene core, were used on their structures.

The Centres for Disease Control in Atlanta said polyethylene is combustible.


Related Articles

Firefighters’ statements ‘a slap in the face’, says Grenfell survivor

Grenfell Tower soil tests reported to reveal ‘huge concentrations’ of toxins

Son forced to leave father before ‘wall of fire’, Grenfell inquiry told

Grenfell survivor recalls last phone call with friend killed in blaze

More in this Section

Mercury spacecraft powered by British ion drive

UK space scientists to investigate Mercury’s mysteries

Three people dead after plane accident in central Germany

Mother who cheated death in parachute jump sabotaged by husband skydives again


Breaking Stories

1 year since Alyssa Milano’s first #MeToo tweet: Have things actually changed for women?

What to wear to a job interview according to a style expert

Online Lives: Megan Kessie - 'Writing my blog became an escape'

Appliance of Science Are all raindrops the same size and shape?

More From The Irish Examiner